Taiwan is committed to the development of offshore wind power, and TERTEC is not absent. In 2017, it signed "third-party offshore wind power" with ABSG Consulting, Northland Power, Copenhagen Wind Energy Development, Zhufeng Power, Zhongneng Power and Yushan Energy. "Memorandum of Cooperation on Verification and Verification", and also signed a "Memorandum of Cooperation on Wind Energy Industry Testing and Certification" with the Spanish National Renewable Energy Center and DNV GL Netherlands B.V. Laboratory.
Guo Fangnan, chairman of the board, said that TERTEC and NKT Cable signed a "Memorandum of Cooperation on Offshore Wind Energy Submarine Cable Test and Certification Cooperation". , DNV GL, SGS, etc. signed the "Wind Energy Industry Cooperation Memorandum".
TERTEC has signed a project verification alliance cooperation with DNV and relevant domestic legal persons in 110 years to assist domestic offshore wind farm project verification service capabilities. Since 2018, it has undertaken the "Offshore Substation Power Design and Power Quality Project Verification" project of the Bureau of Standards and Inspection, and has checked the quality of offshore wind power for an important government green energy plan.